Designing and drawing weldments

In a weldment, the process fights the drawing. Every weld shrinks as it cools and pulls the frame out of square, so holes drilled before welding wander and faces that were flat go wavy. A good weldment drawing plans for that: it keeps welds small and balanced, machines the accurate features after welding, and defines every joint with a weld symbol or a weld note instead of leaving the welder to guess. This guide covers the design rules, how weld symbols work, where datums go, and the tolerances fabrication shops hold.

Design rules for weldments

Welding melts metal along a joint, and the joint shrinks as it cools. That pulls the parts out of position. Most weldment rules are about controlling that distortion, giving the welder access, and deciding what gets machined after welding.

RuleTypical valueWhy
Use standard shapesplate, tube, angle, channel and beam from stock sizesStandard stock is cheap, available, and easy to cut and fit.
Fewer, smaller weldsweld only the joints the function needs, at the size it needsEvery weld adds heat, distortion and cost. An oversized fillet doesn't add useful strength; it adds distortion.
Minimum fillet size by thickness3 mm for parts up to 6 mm thick, 5 mm up to 12 mm, 6 mm up to 20 mm, 8 mm above (AWS D1.1 minimums for steel, set by the thicker part; the weld needn't exceed the thinner part)Too small a fillet on thick plate cools too fast and can crack. These are minimums, not strength calculations: size load-bearing welds by calculation.
Balance the weldsweld symmetrically about the part's neutral axis, or in a sequenceWelds on one side only bow the part.
Accessleave room for the torch or gun at the right angle, and for the welder to see the jointA joint the welder can't reach can't be welded well.
Machine after weldinganything that must be accurate: mounting faces, bearing bores, dowel holesWelding moves pre-machined features. Machining after welding puts them where they belong.
Crop corners on gussetscut the inside corner of gussets and stiffenersLets the welds pass, and on galvanized parts lets zinc, air and cleaning acid flow through instead of collecting in pockets.
Vent and drain hollow parts for galvanizinga vent at the highest and a drain at the lowest point of every closed section, as it hangs in the bath; sized to the section per ASTM A385, for example about 13 mm pairs on 50 mm square tube, 25 mm on 100 mm and 40 mm on 150 mm, or one opening of about 25 to 30% of the section areaSealed sections can burst in the zinc bath, and trapped zinc or acid ruins the coating. Your galvanizer will confirm the sizes.
A weld symbol over a small T joint with ten parts numbered: the arrow, the reference line, the arrow side and the other side, the fillet weld symbol, its size on the left, its length and pitch on the right, the all-around circle, the field weld flag and the tail.
A weld symbol, part by part: this one is a 6 mm fillet on the arrow side, 50 mm long every 150 mm, all around, in the field.

More calculators in the Toolbox

What the drawing must say

One drawing for the whole weldment. The weldment drawing defines the finished, welded part. One fabricator owns it, because overall dimensions can only be held by whoever welds the whole thing. Don't detail the members on separate drawings for different shops. The drawing has:

Weld symbols follow AWS A2.4, not Y14.5. GD&T still controls the dimensions. ISO 2553 draws the arrow side differently, with a dashed identification line, so say which standard the drawing follows and never mix the two. Every joint gets either a complete weld symbol, or a general weld note with exceptions, such as UNLESS OTHERWISE SPECIFIED, ALL JOINTS 5 FILLET ALL AROUND. Never leave joints undefined, and never assume every contact is welded. Every fillet has a size. For a groove weld with no depth given, the symbol means complete joint penetration, so say so when that's what you want.

Datums. If anything is machined after welding, put the datums on the machined features: a machined mounting face as A, and machined holes as B and C. If nothing is machined, A is the base member's mounting face. On large frames that distort, use datum targets, and a restraint note if the frame is clamped for inspection.

Tolerances. Fabrication shops work from a size-banded table, not one tolerance for every size. A 25 mm dimension and a 3 m dimension can't share the same ±. Print the table on the drawing (values below), or cite the standard and class in a note, for example ISO 13920-BF, where B is the linear and angular class and F the straightness and flatness class. Holes drilled before welding get a loose position, because welding moves them. Anything tighter is machined after welding and toleranced like a machined part. Squareness of a frame can be a perpendicularity or profile tolerance, or on a large frame a note that the diagonals are equal within a value.

Notes a weldment needs:

Typical tolerances

TierTypical valueWhat it takesCost
As weldedISO 13920 class B: ±1 mm up to 30 mm, ±2 to 400 mm, ±3 to 1000 mm, ±4 to 2000 mm. Angles ±45′ up to 400 mm, ±30′ to 1000 mm, ±20′ beyond (by the shorter leg). Holes drilled before welding: a loose position, typically about Ø3.Good fit-up and a sensible weld sequenceStandard
Fixtured and straightenedabout ISO 13920 class A: ±1 mm up to 400 mm, ±2 to 1000 mm, ±3 to 2000 mm; angles ±20′, ±15′, ±10′Welding fixtures, tack-and-check, straightening, sometimes stress reliefFixture cost, plus labor per part
Machined after weldingmachining capability (see the CNC guide), to machined datumsA machine large enough for the whole weldment, usually stress relief firstAn extra operation and setup; often the cheapest way to get accuracy on a large part

Worked example: a machine base frame (illustrative)

A base frame is welded from 80 × 80 × 5 mm square steel tube, with a 20 mm top plate that's machined after welding, and then galvanized. The diagram is an illustration, not a drawing from the app.

A welded base frame in front view and its top plate from above. Datum A is the machined top face. Datums B and C are dowel holes machined after welding. The anchor holes in the feet are drilled before welding, and a weld symbol marks a foot joint.
The worked example: datums on the features machined after welding, loose anchor holes drilled before it.
On the drawingWhat it saysWhy
Parts list: tube (cut lengths), top plate, foot plates, gussetsEvery member, its stock size and lengthThe fabricator buys and cuts from it.
Weld symbols: 5 fillet all around at each tube joint; 6 fillet on the top plate, intermittent 50-150 on the long sidesEvery welded joint, with its size, length and pitchNothing is assumed. The intermittent welds limit heat and distortion on the plate.
MACHINE AFTER WELDING: top face flat 0.1, datum A; two dowel holes B and C positioned to AThe mounting surface and locating holes are machined lastThe machine mounted on top needs a flat, accurate face that welding would distort.
Stress relief note with temperature and time, before machiningThe weldment is relaxed before the precision features are cutOtherwise the machined face moves when residual stress is released.
Anchor holes in the feet, drilled before welding, position Ø3Holes that only need to clear anchor boltsNo reason to machine them after welding.
Tolerance table on the sheet (±1 / ±2 / ±3 / ±4 by size)Everything not machined is held to fabrication tolerancesThat's what welding holds.
Galvanize per ASTM A123 after fabrication; vent and drain holes at each tube's ends (about Ø20 mm pairs for this tube); machined face and dowel holes maskedThe coating and how to get it on safelySealed tubes can burst in the zinc bath, and zinc on the machined face would ruin its flatness.
Visual inspection per AWS D1.1; no other NDEThe acceptance level is stated"Good welds" isn't a requirement.

Common mistakes

  1. "Weld all joints", or no weld symbols. The fabricator has to guess which joints, what size and how long. Give each joint a symbol, or a default weld note with listed exceptions.
  2. Machining tolerances on as-welded features. A hole drilled before welding won't stay within ±0.1 after welding. Put the tight features on machined surfaces, after welding.
  3. Closed sections without vents. For galvanizing they're a safety hazard, and for painting they trap moisture. Add vent and drain holes and show them.
  4. Members detailed for different shops. No one can then hold the overall dimensions. One fabricator, one weldment drawing.
  5. "Stress relieve" with no cycle, and no inspection stated. Give the specification or the temperature and time, and name the NDE method and acceptance, even if it's visual only.

Questions

How do you read a weld symbol?

The arrow points to the joint. The symbol below the reference line applies to the arrow side of the joint, and the symbol above it to the other side. The size goes to the left of the weld symbol and the length and pitch to the right. Where the arrow meets the reference line, a circle means weld all around and a flag means a field weld. The tail carries a process or specification reference. Weld symbols follow AWS A2.4; ISO 2553 places the arrow-side symbol differently.

Where should datums go on a weldment?

On the features machined after welding, if there are any: a machined mounting face as datum A and machined holes as B and C. If nothing is machined, use the base member's mounting face, and datum targets on large frames that distort.

What tolerance can a weldment hold?

Fabrication tolerances grow with size, so shops work from a size-banded table rather than one ± for every dimension. ISO 13920 class B, a common default, allows ±1 mm up to 30 mm, ±2 mm up to 400 mm, ±3 mm up to 1000 mm and ±4 mm up to 2000 mm. Anything that has to be tighter is machined after welding and toleranced like a machined part.

Should holes be drilled before or after welding?

Holes that only need to be roughly placed can go in before welding, with a loose position tolerance. Holes that locate other parts, such as dowel and bearing holes, are machined after welding, because welding moves them.

What notes does a weldment drawing need?

The welding code (for example AWS D1.1 for structural steel), the inspection requirement, which features are machined after welding, any stress relief cycle, the coating, and the delivered condition.